Full title: After severe 76% electricity price hikes due to AI data centers, Virginia requires firms to pay for all dedicated upstream electrical infrastructure — State regulators crack down, governor says move will save civilians ‘hundreds of millions of dollars’

  • CompactFlax@discuss.tchncs.de
    link
    fedilink
    English
    arrow-up
    19
    ·
    19 hours ago

    pay for all the required transmission infrastructure that the project will use exclusively.

    Emphasis mine. If the AI buildout can claim that the line will serve as a secondary entry point for a neighbourhood they’re not going to pay.

    • geekwithsoul@piefed.social
      link
      fedilink
      English
      arrow-up
      4
      ·
      18 hours ago

      At least in Northern Virginia where most of the existing data centers are and where most of the announced build out is planned, populations are steady or falling - not a lot of new residential buildouts for them to tie new power capacity to, and current neighborhoods already have existing power capacity built out for them. Anything the data centers ask for is pretty much 100% for their use and not anyone else’s.

        • moodoovoodoo@lemmy.world
          link
          fedilink
          English
          arrow-up
          2
          ·
          15 hours ago

          Yuuup. At the data centers I’ve been to in VA, there are smaller buildings peppered in which house small businesses. Bet your ass all it takes is a little gyro shop to qualify as sharing the infrastructure.

          • Lost_My_Mind@lemmy.world
            link
            fedilink
            English
            arrow-up
            1
            arrow-down
            1
            ·
            14 hours ago

            Oh man! I can get a gyro now??? Sweet deal!!!

            deadpans left

            deadpans right

            …I was being sarcastic!